Sunflower Hill Landing reclaimed (Oct. 2006)

October 16, 2006

Over the summer Tembec had the large grinding machine chop up the big slash pile on the Sunflower Hill landing.  The chips were trucked offsite to the pulp for hog fuel.  In October a backhoe was sent to the landing to recontour both it and the short piece of road that ran into it from Jimmy Russell Road.  As an added bonus the backhoe redug the drainage ditches along Jimmy Russell Road that had been obliterated by the machinery moving up and down it.

Pam and John stand behind one of the drainage ditches that Tembec restored after the Sunflower Hill landing was reclaimed.

 

 