Hand Treatment Prescriptions (June 2010)

We now have the finalized prescriptions for the hand treatment areas outlined below. Changes have been made to prevent burnpile placement on trails, to preserve some rotting coarse woody debris and avoid slashing all the deciduous shrubs. Work is expected to start after contractors are chosen around July 9th. You can download the prescriptions below.

Unit 3.2 - Both sides of Second Eimer's slough

Unit 3.3 - Steep hillside between Stump Trail and Hillside

Unit 3.4 - Romantic Ridge to Suicide Trail

Unit 3.5 - Above the Lower Army Road

Unit 3.11 - On and above lower Shapeshifter

Unit 3.22 - Rocky ridge below S.W. Passage Lookout